Thursday, October 2, 2008

Conclusion


RF = Royal family
The five cute doll represent our 5 members.
Yellow colour represent CHUA BOON NENG.
I being the strongest male on the team, cut the thick wires quite easily and that did speed things up. When i rest, i teach them the method how to cut teh wire easily and fast. But this is really need to spend a lot of energy. This also made my hand injury.
Light green colour represent LING BI WEI.
Bi Wei is the 'engineer' on board. He is very persistent with his method and correcting our errors. About this case, he always argue with group member. Finally, group member also accept his opinion.
Brown colour represent ADELINE CHAN CHIEEN HWEI.
Being the sole female in the group, her definitely don't want to be left out. She help the group cut wires, bend wires and try to bind the dome. Besides that she also completed the group report.
Dark green colour represent THOR YI CHUN.
He is our group leader. He is the spritual motivator as us when we all give up. He also a joker. Always creater laughter to our and give our feeling more relax.
Sky blue colour represent LEONG MUN WAI.
He instructions kept us in order and with that we managed to experiment and completed the dome for domes day.
Reference
In the order don't get to involved in Plagiarism. In here, i let CikWan know first. I have take some picture from your wedside.
In this post, there are some reference i used to update my blog :
Dome
http://www.dese
rtdomes.com/dome3calc.html
Beside this ,for the dome project, Adeline Chan is to be a team photograph.So from our group members, the picture and report might will be similar.
Ling Bi Wei


Day 4 - 10th September 2008

Morning Briefing

Intension : Make sure all member know their own site to built dome

Act : All 2008/2009 first year HBP students

Actor : En. Wan Burhanuddin

Site : E48A

This morning, CikWan that briefing give our a BIG surprise. That surprise is our site change to quite far.



CikWan giving briefing.
Before
Our group number is NO.37 is nearly the HBP studio
AfterSite to be change. Our group change to be quite far.

This is same like time table to gave our follow.

After finish the briefing, we all must to be take picture for our own grou first and made a ecord.

Intension : Complete construction the dome

Act : Royal Family members (Group 37)

Site : Nearly USM swimming pool

Rules : Complete on 30 minutes

Pruduct : Dome

Smell....

Take a picture!!!


Starting binding the dome and used wire


Complete as soon as well

Yeah....
Dome complete on 30 minutes and can accommodate 5 members. Hehe

Help our dome take a cover

Finishes.

Hehehe!!!
Feeling so happy afetr construction the dome as well!

RF = Roral Family
This is our team identity

After few day ago, our dome still can be well.

Wednesday, October 1, 2008

Continue Dome Built Project

Day 3 - 9th September 2008


Intension : Complete all thing ,package and finish report.


Site : Studio 100

Actor :
From the left: CHUA BOON NENG, LEONG MUN WAI, ADELINE CHAN CHIENN HWEI, LING BI WEI and THOR YI CHUN ( Group Leader )





At the night, our already finish construction our dome as soon as well. At the time, i can't believe that thing can be completed. But now the dome is in front of my side. Anyway, i believe that
" IMPOSSIBLE IS NOTHING"
Try to construction the dome.

Complete as soon as well.

Can be carry by 3 members.

See. Can believe with your all eyes.

The dome can accommodate 3 members, chairs and table.

For the first, we paln to used garbage palstis beg to be a cover. After thinking and lucky, gave our find the fabric at studio. So the yellow fabric become our dome cover.

Draw the team identity

Colouring the team identity

Cutting.......

Group 37 ( Royal Family ) identity


The dome report finishes as soon.
After success built the dome , we take off all. Then start package the dome.







Day 2- 8th September 2008
Intension : Finish cut and bending the wire.
Site : Bakti Permai Cafe and Studio 100

Actor : Group 37 ( Royal Family)
Continue the work

He is our 37 group leader = Thor Yi Chun bending
to cut the wire. This is his strength.

Jus complete a few.


This is our all material (wire) finish cut and bending

After finish cutting and bending the wire , our start construction dome.
Bind the wire .

Finish the first floor.


Zoom... See more detail..


After finish built the first floor, we take the dome go to studio 100 stay.

Take picture at studio 100 to be prove.

Tuesday, September 30, 2008

Dome Built Project

The dome built project was gave at 27th August 2008 by CikWan. When i hear it and have seen the dome picture. I feel this thing is mission impossible to my own. I think so is impossible to all HBP student too. So our team name will to be IMPOSSIBLE IS NOTHING. This dome built project given two week to prepare allthing. First week, our group just feel so relax for the dome built project. Didn't plan and discuss anything. After one week left, we just plan how to built the dome and discuss what type of material wan to used!


First time, we think wan to use the bamboo to built dome. But after think, we feel cannot use bamboo. This is because don't know bamboo can be recycle to what thing. Finally, we think to using wire to built the dome.

Intension : To built the dome

Actor : Five member to be one group without same major

Site : Inside USM

Rule : Please reference the picture



Day 1 -7th September 2008

Intensiontry to built the example dome and standby to cut material(wire) for built the dome.

Site : Bakti Permai Cafe

Actor : 5 Royal family members. Adeline Chan, Chua Boon Neng, Leong Mun Wai, Ling Bi Wei and Thor Yi Chun.

Rule : 30 rods of A-struts with the measurement of 52.3cm in length

55 rods of B-struts with the measurement of 60.5cm in length

80 rods of C-struts with the measurement of 61.9cm in length

Pruduct : Dome

5 members of royal family meet at Bakti Permai cafe at around 5-6pm. We are built a small dome first and see can be success not!

We go to dome calculator wedside to find to how constuction the dome.


After our team discuss , finally dicision is construction 3V dome.
Our dome radius is 150cm.










Pratice to construction small dome.




This is our small dome


After small example dome finish, we all start to built the dome. But we must cut the material first.



Need to spend a lot of energy



First day material consummately
End of first day


* to be continue

Tuesday, September 2, 2008

USM 37th Convocation 2008 From Event to Oval

USM 37th Convocation 2008 was held on 13th-17th 2008


This production model allot 6 elements.That is :-


  • INTENSION : Prepare tent to hawker sales when convocation take a palce

  • ACT : Worker to build up and take off the tent

  • ACTOR : Worker and hawker

  • RULE : afety first and done by the week

  • SIDE : Beside Dewan Tunku Syer Putra (DTSP)

  • PRODUCT : Tent


USM 38th convocation 2008 is coming !!!!!!!


This signboard to show map for convocation



so enliven.

i cannot believe that .too many people eat at here

specially to children

recycle are

LAST NIGHT FOR CONVOCATION
still can see so enliven

hawker start put store in car


all store (dolly bear) already put in car

worker clean the rubbish
all hawker go back

15th August 2008 morning only can see tents



20th-23th August take off tents
take out screw

after take off tents, put into lorry

EMPTY PLACE

to be car park now